Hydro Power Plant
“Kovanići”

Location of the facility – the Bosna River, area of the Zenica-Doboj Canton
Type of facility – run of river power plant
Installed capacity - 12,2 MW
Annual production - 58,5 GWh

Investment

Investment - BAM 90 million
Financing - Loans with funds of EPBIH

Project status

  • Feasibility study – 2016
    Designer: Consortium - FICHTNER GmbH and Co KG, Electroforce d.o.o.

  • Geological-geotechnical investigation works – 2016
    Contractor: Geosonda Zenica

  • Preliminary Design – 2021
    Designer: Energoinvest d.d. Sarajevo
    Auditor: Consortium / Institute for Water Management d.d. Sarajevo, IBE d.d. Ljubljana, IGH d.o.o. Mostar, Zagrebinspekt d.o.o. Mostar

  • Environmental impact study - 2023
    Consultant: Ceteor Sarajevo